Inputs#
This section describes the user inputs required to run the BuildStock Projections workflow. A typical run will include the following inputs provided by the user:
Configuration file or CLI arguments 🔗
Initial buildstock.csv files and options_lookup.tsv file 🔗
Future population projections 🔗
New construction option files (optional) 🔗
Existing stock option files (optional) 🔗
If running with a subset of PUMAs (not a full national scale), filter down the buildstock.csv to the desired region(s), and other inputs will automatically use just the available locations.