Inputs#

This section describes the user inputs required to run the BuildStock Projections workflow. A typical run will include the following inputs provided by the user:

  • Configuration file or CLI arguments 🔗

  • Initial buildstock.csv files and options_lookup.tsv file 🔗

  • Future population projections 🔗

  • New construction option files (optional) 🔗

  • Existing stock option files (optional) 🔗

If running with a subset of PUMAs (not a full national scale), filter down the buildstock.csv to the desired region(s), and other inputs will automatically use just the available locations.